POTENTIAL AND CURRENT RESIDENTS 

Dip galvanizing workshops

Production of anti-corrosion protection as part of electroplating and hot- dip galvanizing shop

Implementation period: 2023 – 2026 

Investment volume: 7,000 million rubles

Project

Plant for the production of polymer-bitumen waterproofing and roofing materials

Production of polymer-bitumen waterproofing and roofing materials, polymer and bitumen-polymer self-adhesive materials, liquid water-based and polymer mastics, extruded polystyrene foam, insulation.


Implementation period:
2023 – 2025

Tekhnonikol-primorye


ACTIVE

Sandwich panel production plant

Three-layer wall and roof panels with basalt filler

Implementation period:  2022 - 2024

MTC Lotos


ACTIVE

Plant for production of recycled plastic

Production of recycled plastic PS (Polystyrene), PE (polyethylene), HDPE (High Density Polyethylene), PP (Polypropylene)

Implementation period: 2022 – 2026 гг.

PROJECT

Plant for the production of reinforced concrete products

Production of reinforced concrete products, non-autoclaved aerated concrete, ready-mixed concrete

Implementation period:  2023 – 2025

.

SD Trest-Vostokzhilstroy


POTENTIAL

Factory for the production of construction sandwich panels WALLSAVING

Production of three-layer wall panels from foamed polystyrene granules on a cement binder and two facing sheets

Implementation period:  2023 – 2024

WALLSAVING​


POTENTIAL

Register of residents