POTENTIAL AND CURRENT RESIDENTS 

Dip galvanizing workshops

Production of anti-corrosion protection as part of electroplating and hot- dip galvanizing shop

Implementation period: 2023 – 2026 

Investment volume: 7,000 million rubles

Project

Plant for the production of polymer-bitumen waterproofing and roofing materials

Production of polymer-bitumen waterproofing and roofing materials, polymer and bitumen-polymer self-adhesive materials, liquid water-based and polymer mastics, extruded polystyrene foam, insulation.


Implementation period:
2023 – 2030

Tekhnonikol-primorye


ACTIVE

Autoclaved Aerated Concrete Block Production Plant


Implementation period:
2023 – 2027

Primorskiy zavod stroitel'nykh materialov


ACTIVE

Plant for production of recycled plastic

Production of recycled plastic PS (Polystyrene), PE (polyethylene), HDPE (High Density Polyethylene), PP (Polypropylene)

Implementation period: 2022 – 2026 гг.

PROJECT

Plant for the production of reinforced concrete products

Production of reinforced concrete products, non-autoclaved aerated concrete, ready-mixed concrete

Implementation period:  2023 – 2027

.

SD Trest-Vostokzhilstroy


ACTIVE

Register of residents